Production building

Palfinger - Crane Testing Plant

Project description

 

Expansion of the existing Palfinger Dreggen Poland Sp. z o.o. Crane Testing Plant at 71 Kontenerowa St. in Gdynia - phase II.

 

The scope of work included finishing works on the 2nd floor of the welfare and office building, construction of production building No. 2, and site development. Electrical works were included as well. The Contractor was responsible for obtaining an occupancy permit.

 

Investor:

Palfinger Dreggen Poland Sp. z o.o.

Project implementation time:

10.2015 – 07.2016

(Useful) net floor area:

1.300 m2

Internal cubic volume:

23.400 m3

Location:

Gdynia, Kontenerowa St.